Construction Monitoring Control Systems Ltd

Tel/Fax  01923 682300

 
 
  Bookmark this site.
 


  1. Index
  2. CMCS at BRE
  3. Development of AMS
  4. Non-destructive testing of Marine Jetties
  5. Fixed sensor monitoring of Diaphragm walls
  6. Monitoring Buildings during Redevelopment
  7. Tunnel Monitoring
  8. Embankment Systems
  9. Loggers
  10. Tunnel Distortion Monitoring
  11. In-place tilt monitoring system
  12. Tunnels Interaction System
  13. Re-Development of Small Properties
  14. Viaducts
  15. DLR at Mansion House
  16. Tunnel Monitoring System (Discrete beams)
  17. CTRL 240
  18. Dams
  19. Electro-levels
  20. Movement indicators
  21. Results of Charing Cross Load Cells
  22. Non-destructive testing of concrete structures
  23. Radio in Construction Monitoring
  24. Settlement Reducing Piles
  25. Land Surveying and Total Station Monitoring
  26. Vibration Monitoring
  27. Monitoring the complete strain history of concrete elements
  28. Past CMCS Projects

Client: JNP Infraco Date: October 02 -

Aldwych, London: Act as instrument consultant (Design and supply) state of the art techniques for assessing in-situ stresses in LUL cast iron tunnel linings.

Client: LUL Date: 2000

London: Monitor interaction with Northern Line tunnels during refurbishment of Century House.

Client: Sir R McApline. Date: 2000 - October 02

Sloan Square, London: Design and install an automatic movement and strain monitoring system at Cadogan Mansions. (Brick tunnel).

Client: Brown & Root. Date: 2000

Design and install an automatic movement and strain monitoring system at St Paul's (two running tunnels). City Cable tunnel drive under LUL tunnels

Client: Brown & Root. Date: 2000

Design and install an automatic movement and strain monitoring system at Paternoster Square (two running tunnels).

Client: Sir Robert McAlpine. Date: 2000

Extend monitoring system in tunnels at Cadogan Mansions.

Client: Burford Ltd. Date: 2000

Design and install an automatic movement and strain monitoring system Green Park.

Client: Waterman Environmental. Date: Sept 1999

Design and install an automatic movement and strain monitoring system Paternoster Square.

Client: LUL. Date: 1999.

Supply and install automatic movement and strain monitoring system for various site for London Underground Ltd 'Knowledge and Planning Commission' including remote data retrieval by modem and alarms. Paddington, High St Kensington, Kentish Town, Waterloo, Kensington (Northern line).

Client: Laings. Date: 1998/99.

Supply and install an automatic strain and movement monitoring system in the Bakerloo Line tunnels for the Stakis Metropole Hotel extension. Including remote data retrieval by modem and pager alarms.

Client: Bovis. Date: 1998/99.

Supply and install an automatic movement and strain monitoring system for the Central Line at St Paul's during Christ Church Court Development. Including remote data retrieval by modem and pager alarms.

Client: St George South London. Date: 1998/99.

Supply and install an automatic movement and strain monitoring system for the Victoria Line at Vauxhall during the EFFRA Development. Including remote data retrieval by modem and pager alarms.

Client: Haymills. Date: 1998/99.

Supply and install an automatic movement and strain monitoring system for the District/Circle line at Symonds St during Cadogan Estates Development. Including remote data retrieval by modem and alarms.

Client: Bingham & Cotterell. Date: 1998.

Supply and install an automatic strain monitoring system for the Central Line at Mile End during Green Bridge construction.

Client: Balfour Beatty Date: 1994-1997.

JLE 102 Main Monitoring Contract - as part of this project CMCS installed monitoring equipment in the following tunnels: The Bakerloo Backshunt North and South, The Jubilee Line tunnels, The Northern Line tunnels (Northbound and Southbound), The Bakerloo Line tunnels (Northbound and Southbound) and the Waterloo and City Line tunnels. See also main entry under Buildings.

Client: LUL. Date: 1996-1997.

Monitoring movement and strain in running tunnels at Embankment during dredging of the River Thames. Monitoring system, electro-levels, VW gauges, remote data retrieval by modem.

Client: LUL. Date: 1996.

Design, install and report on manual movement system for High Street Kensington, covered way tunnels.

Client: Tarmac/JLE. Date: 1996.

Design, install automatic movement detecting system, Green Park Underground Station including remote data retrieval by modem and pager alarm system.

Client: Eastern Electricity Board. Date: 1996

Supply, install and manage an automatic movement detecting system, Euston Square Underground Station.

Client: Thames Water. Date: 1996.

Manage, design and install an automatic movement detecting system, Abbey Mills LUL underground tunnels.

Client: Allot Lomax. Date: 1995.

Monitoring the movement of the running tunnels at Finsbury Park, while transporting a heavy bridge section along the roadway 5 m above the tunnels.

Client: Sir Robert McAlpine. *

The design and installation of a computer controlled movement-monitoring system protecting the surrounding buildings during the construction of the escalator shafts at the Waterloo International Terminal. The system consists of 225 instruments of various types for the measurement of movement and the control of compensation grouting and included structural monitoring above the tunnel.

Client: London Underground Limited. *

The design and installation of an early warning system of disturbance to cast iron beams supporting an active underground rail tunnel during the demolition of super structure above the beams.

Client: London Underground Limited. *

The design and installation of an automatic tunnel convergence monitoring system for the Angel re-development.

 
 
Home Page Tunnels Embankments Bridges Retaining Walls Pile Monitoring Buildings Environmental Surveying
Home Page Information Sheets Software - LogSafe Hardware - Data Acquistion Instrumentation
Home Page Taplow Pipe Jack Cheval Place St Andrews Hall Canonbury Tunnel Euston Covent Garden
Information