| Client: JNP Infraco | Date: October 02 - |
Aldwych, London: Act as instrument consultant (Design and supply) state of the art techniques for assessing in-situ stresses in LUL cast iron tunnel linings.
|
| Client: LUL | Date: 2000 |
London: Monitor interaction with Northern Line tunnels during refurbishment of Century House.
|
| Client: Sir R McApline. | Date: 2000 - October 02 |
Sloan Square, London: Design and install an automatic movement and strain monitoring system at Cadogan Mansions. (Brick tunnel).
|
| Client: Brown & Root. | Date: 2000 |
Design and install an automatic movement and strain monitoring system at St Paul's (two running tunnels). City Cable tunnel drive under LUL tunnels
|
| Client: Brown & Root. | Date: 2000 |
Design and install an automatic movement and strain monitoring system at Paternoster Square (two running tunnels).
|
| Client: Sir Robert McAlpine. | Date: 2000 |
Extend monitoring system in tunnels at Cadogan Mansions.
|
| Client: Burford Ltd. | Date: 2000 |
Design and install an automatic movement and strain monitoring system Green Park.
|
| Client: Waterman Environmental. | Date: Sept 1999 |
Design and install an automatic movement and strain monitoring system Paternoster Square.
|
| Client: LUL. | Date: 1999. |
Supply and install automatic movement and strain monitoring system for various site for London Underground Ltd 'Knowledge and Planning Commission' including remote data retrieval by modem and alarms. Paddington, High St Kensington, Kentish Town, Waterloo, Kensington (Northern line).
|
| Client: Laings. | Date: 1998/99. |
Supply and install an automatic strain and movement monitoring system in the Bakerloo Line tunnels for the Stakis Metropole Hotel extension. Including remote data retrieval by modem and pager alarms.
|
| Client: Bovis. | Date: 1998/99. |
Supply and install an automatic movement and strain monitoring system for the Central Line at St Paul's during Christ Church Court Development. Including remote data retrieval by modem and pager alarms.
|
| Client: St George South London. | Date: 1998/99. |
Supply and install an automatic movement and strain monitoring system for the Victoria Line at Vauxhall during the EFFRA Development. Including remote data retrieval by modem and pager alarms.
|
| Client: Haymills. | Date: 1998/99. |
Supply and install an automatic movement and strain monitoring system for the District/Circle line at Symonds St during Cadogan Estates Development. Including remote data retrieval by modem and alarms.
|
| Client: Bingham & Cotterell. | Date: 1998. |
Supply and install an automatic strain monitoring system for the Central Line at Mile End during Green Bridge construction.
|
| Client: Balfour Beatty | Date: 1994-1997. |
JLE 102 Main Monitoring Contract - as part of this project CMCS installed monitoring equipment in the following tunnels: The Bakerloo Backshunt North and South, The Jubilee Line tunnels, The Northern Line tunnels (Northbound and Southbound), The Bakerloo Line tunnels (Northbound and Southbound) and the Waterloo and City Line tunnels. See also main entry under Buildings.
|
| Client: LUL. | Date: 1996-1997. |
Monitoring movement and strain in running tunnels at Embankment during dredging of the River Thames. Monitoring system, electro-levels, VW gauges, remote data retrieval by modem.
|
| Client: LUL. | Date: 1996. |
Design, install and report on manual movement system for High Street Kensington, covered way tunnels.
|
| Client: Tarmac/JLE. | Date: 1996. |
Design, install automatic movement detecting system, Green Park Underground Station including remote data retrieval by modem and pager alarm system.
|
| Client: Eastern Electricity Board. | Date: 1996 |
Supply, install and manage an automatic movement detecting system, Euston Square Underground Station.
|
| Client: Thames Water. | Date: 1996. |
Manage, design and install an automatic movement detecting system, Abbey Mills LUL underground tunnels.
|
| Client: Allot Lomax. | Date: 1995. |
Monitoring the movement of the running tunnels at Finsbury Park, while transporting a heavy bridge section along the roadway 5 m above the tunnels.
|
| Client: Sir Robert McAlpine. * |
The design and installation of a computer controlled movement-monitoring system protecting the surrounding buildings during the construction of the escalator shafts at the Waterloo International Terminal. The system consists of 225 instruments of various types for the measurement of movement and the control of compensation grouting and included structural monitoring above the tunnel.
|
| Client: London Underground Limited. * |
The design and installation of an early warning system of disturbance to cast iron beams supporting an active underground rail tunnel during the demolition of super structure above the beams.
|
| Client: London Underground Limited. * |
The design and installation of an automatic tunnel convergence monitoring system for the Angel re-development.
|