| Client: Fugro | Date 2001 |
Supplied EL system for Lateral load tests on tubular steel piles
|
| Client: Imperial College. | Date: 1998 |
Long-term pile load testing at Canons Park.
|
| Client: The University of Naples. | Date: 1996 |
Manufacture 5,000 - 10,000 kN load cells for pile testing Italy. Supply automatic pile testing equipment and software.
|
| Client: The Building Research Establishment. | Date: 1995. |
Manufacture and installation of a pile load cell, extensometers and strain gauges for a pile test for the Daiwa Bank, London.
|
| Client: Thai Bauer. | Date: 1995. |
Maintain 40,000 kN load cell (designed by G Price) Bangkok.
|
| Client: Stent Foundation, Ove Arup & Partners. * |
The design and installation of pile testing equipment.
|
| Client: Ove Arup & Partners. * |
The design and installation of pile testing equipment.
|
| Client: Thai Bauer. * |
The design and installation of a pile monitoring system to determine bending moments in piles in Bangkok.
|
| Client: May Gurney | Date: August 1999. |
Design install and report on monitoring load distribution in CFA piles.
|
| Client: WS Atkins | Date: July 1999 |
Act as Consultant to WS Atkins on offshore conductor pipe tests under lateral load
|