Construction Monitoring Control Systems Ltd

Tel/Fax  01923 682300

 
 
  Bookmark this site.
 


  1. Index
  2. CMCS at BRE
  3. Development of AMS
  4. Non-destructive testing of Marine Jetties
  5. Fixed sensor monitoring of Diaphragm walls
  6. Monitoring Buildings during Redevelopment
  7. Tunnel Monitoring
  8. Embankment Systems
  9. Loggers
  10. Tunnel Distortion Monitoring
  11. In-place tilt monitoring system
  12. Tunnels Interaction System
  13. Re-Development of Small Properties
  14. Viaducts
  15. DLR at Mansion House
  16. Tunnel Monitoring System (Discrete beams)
  17. CTRL 240
  18. Dams
  19. Electro-levels
  20. Movement indicators
  21. Results of Charing Cross Load Cells
  22. Non-destructive testing of concrete structures
  23. Radio in Construction Monitoring
  24. Settlement Reducing Piles
  25. Land Surveying and Total Station Monitoring
  26. Vibration Monitoring
  27. Monitoring the complete strain history of concrete elements
  28. Past CMCS Projects

Client: Fugro Date 2001

Supplied EL system for Lateral load tests on tubular steel piles

Client: Imperial College. Date: 1998

Long-term pile load testing at Canons Park.

Client: The University of Naples. Date: 1996

Manufacture 5,000 - 10,000 kN load cells for pile testing Italy. Supply automatic pile testing equipment and software.

Client: The Building Research Establishment. Date: 1995.

Manufacture and installation of a pile load cell, extensometers and strain gauges for a pile test for the Daiwa Bank, London.

Client: Thai Bauer. Date: 1995.

Maintain 40,000 kN load cell (designed by G Price) Bangkok.

Client: Stent Foundation, Ove Arup & Partners. *

The design and installation of pile testing equipment.

Client: Ove Arup & Partners. *

The design and installation of pile testing equipment.

Client: Thai Bauer. *

The design and installation of a pile monitoring system to determine bending moments in piles in Bangkok.

Client: May Gurney Date: August 1999.

Design install and report on monitoring load distribution in CFA piles.

Client: WS Atkins Date: July 1999

Act as Consultant to WS Atkins on offshore conductor pipe tests under lateral load

 
 
Home Page Tunnels Embankments Bridges Retaining Walls Pile Monitoring Buildings Environmental Surveying
Home Page Information Sheets Software - LogSafe Hardware - Data Acquistion Instrumentation
Home Page Taplow Pipe Jack Cheval Place St Andrews Hall Canonbury Tunnel Euston Covent Garden
Information