| Client: University of Naples. | Date: 2000. |
Supply instruments for pile test in Italy.
|
| Client: May Gurney. | Date: Sept 1999. |
Design and install strain gauges in three construct in place piles at Dudley.
|
| Client: TRANSCO. | Date: 1996. |
Design, supply and install movement-monitoring equipment for gas meters in Cardiff to determine the long term effects of ground water changes.
|
| Client: University of Naples. | Date: 1996. |
Design and supply an automatic movement monitoring system for an ancient Roman Theatre buried at the same time as the destruction of Pompeii, Italy.
|
| Client: Ritchies. * |
The design and installation of a movement-protection system for a harbour wall at Kinlochbervie, North of Scotland.
|
| Client: Birse. | Date: 1999. |
Design, manufacture and install tie bar load cells.
|
| Client: Edmund Nuttall. | Date: 1998. |
Design and manufacture a borehole-mapping instrument 'The Deflecctometer' for use at Dorney Bridge to plot freezing line boreholes.
|
| Client: Thorburn Colloquon. | Date: 1998. |
Design and manufacture a portable stanchion verticality monitor for use on Railtrack stanchions.
|
| Client: Taylor Woodrow Engineering Ltd. | Date: 1997. |
Design, manufacture and carry out field trials on an automatic rig alignment system, to allow rapid repeated set ups for vertical or angled drilling.
|