Construction Monitoring Control Systems Ltd

Tel/Fax  01923 682300

 
 
  Bookmark this site.
 


  1. Index
  2. CMCS at BRE
  3. Development of AMS
  4. Non-destructive testing of Marine Jetties
  5. Fixed sensor monitoring of Diaphragm walls
  6. Monitoring Buildings during Redevelopment
  7. Tunnel Monitoring
  8. Embankment Systems
  9. Loggers
  10. Tunnel Distortion Monitoring
  11. In-place tilt monitoring system
  12. Tunnels Interaction System
  13. Re-Development of Small Properties
  14. Viaducts
  15. DLR at Mansion House
  16. Tunnel Monitoring System (Discrete beams)
  17. CTRL 240
  18. Dams
  19. Electro-levels
  20. Movement indicators
  21. Results of Charing Cross Load Cells
  22. Non-destructive testing of concrete structures
  23. Radio in Construction Monitoring
  24. Settlement Reducing Piles
  25. Land Surveying and Total Station Monitoring
  26. Vibration Monitoring
  27. Monitoring the complete strain history of concrete elements
  28. Past CMCS Projects

Client: University of Naples. Date: 2000.

Supply instruments for pile test in Italy.

Client: May Gurney. Date: Sept 1999.

Design and install strain gauges in three construct in place piles at Dudley.

Client: TRANSCO. Date: 1996.

Design, supply and install movement-monitoring equipment for gas meters in Cardiff to determine the long term effects of ground water changes.

Client: University of Naples. Date: 1996.

Design and supply an automatic movement monitoring system for an ancient Roman Theatre buried at the same time as the destruction of Pompeii, Italy.

Client: Ritchies. *

The design and installation of a movement-protection system for a harbour wall at Kinlochbervie, North of Scotland.

Client: Birse. Date: 1999.

Design, manufacture and install tie bar load cells.

Client: Edmund Nuttall. Date: 1998.

Design and manufacture a borehole-mapping instrument 'The Deflecctometer' for use at Dorney Bridge to plot freezing line boreholes.

Client: Thorburn Colloquon. Date: 1998.

Design and manufacture a portable stanchion verticality monitor for use on Railtrack stanchions.

Client: Taylor Woodrow Engineering Ltd. Date: 1997.

Design, manufacture and carry out field trials on an automatic rig alignment system, to allow rapid repeated set ups for vertical or angled drilling.

 
 
Home Page Tunnels Embankments Bridges Retaining Walls Pile Monitoring Buildings Environmental Surveying
Home Page Information Sheets Software - LogSafe Hardware - Data Acquistion Instrumentation
Home Page Taplow Pipe Jack Cheval Place St Andrews Hall Canonbury Tunnel Euston Covent Garden
Information