Client Naples University. | Date: July 02 - |
Naples: Provide load sensing units for pile raft research project |
| Client: Techno - In | Date: August 01 |
Naples: design and help install VW gauges to monitor strain in Tuff caverns during filling with concrete.
|
| Client: Durtnalls | Date: 1997-1998. |
Design and install movement-monitoring systems at 11 Brick St. A major new basement structure was constructed while preserving the integrity of the existing listed building. Electro levels were installed in some of the diaphragm wall piles to allow continuous monitoring as the basement was formed; a jacking arrangement allowed the props to be adjusted to correct any movements. Movements of the excavation were also checked using precise taping. See also structural monitoring.
|
| Client: Fratelli Dioguardi. | Date: 1995 |
The design and installation of a movement protection system for a diaphragm wall during the construction of a 30 m deep car park in Naples, Italy.
|
| Client: Pell Frischman. |
The design and installation of diaphragm wall monitors.
|
| Client: Davies Middleton & Davies Ltd.* |
The design and installation of a building and diaphragm wall monitoring system at the Packet Pub, Cardiff, during the excavation of a major road cutting.
|
| Client: Giustino Costruzioni. |
The design and installation of a pile cap monitoring system for the main support of a motorway bridge at the Garigliano River, Southern Italy. *
|
| Client: Dept of Transport. * |
An investigation into the performance of vertical and inclined piles under lateral and vertical, static and cyclic loading.
|
| Client: Ove Arup and Partners. * |
The design and installation of three levels of shaft load cells in a 3 m diameter, 20,000 kN working pile for Fenchurch Street Station and later Charring Cross Station redevelopments.
|
| Client: Dept of Environment. * |
The design and installation of 1.5 m diameter load cells and raft pressure cells for the Queen Elizabeth II Conference Centre, Westminster.
|
| Client: Stent Foundation. * |
The design and installation of 1.5 m diameter base load cells for 40 deep bored piles formed under bentonite.
|
| Client: British Council. * |
The design and installation of instruments in a pile group and the subsequent management of a major investigation into the performance of piles in expansive soils in India.
|