| Client: Gear Construction | Date: June 2002 - |
Lambeth, London: Monitoring railway embankment close to top down construction of new Park Plaza hotel. Also automatic monitoring of diaphragm wall supporting the new excavation.
|
| Client: SLR | Date: 2001 - ongoing |
Monitor ground movements under a new waste disposal cell at Bromborough to protect major oil pipeline.
|
| Client: May Gurney | Date: 2000 - ongoing |
Design and install embankment monitoring system at Ilkley with alarm systems in both signal boxes and RailTrack control centres at York.
|
| Client: Naples University |
Design and install monitoring system for instrumented pile holding a landslide area in Italy.
|
| Client: Christiani Nielsen. |
Design and install an automatic movement system for an active 2-line railway embankment at Northfleet, Kent (Under Bridge 838) during the construction of a bridge under the embankment.
|
| Client: Thorburn Colquhoun | Date: 1999 - ongoing |
Design and install an automatic movement monitoring system for an embankment in Paisley Scotland, Anchor House embankment.
|
| Client: Edmund Nuttalls. | Date: 1997 - 98. |
Design and install a vertical and lateral movement monitoring system for a four-track section of rails at Dorney Bridge during condition grouting and push through of a new underbridge.
|
| Client: Thorburn Colquhoun. | Date: 1997 |
Design and install an embankment monitoring system at Cuffley.
|
| Client: Thorburn Colquhoun. | Date: 1997 |
Design and install an embankment monitoring system at Arkholme.
|
| Client: Taylor Woodrow. | Date: 1994 - 97 |
JLE 102 Main Monitoring Contract - as part of this project CMCS installed in place electro level inclinometer boreholes at locations including: Storeys Gate, Parliament St, New Palace Yard, Winchcote St and Mepham St. Several sets of instruments were also installed in the Westminster Diaphragm Wall. See also main entry under Buildings.
|
| Client: Geocisa. | Date: 1996 |
Design and install vertical movement monitoring system for main road stabilisation Madrid, Spain..
|
| Client: Edmund Nuttalls. | Date: 1996 |
Design and install an embankment monitoring system at Rayleigh Weir.
|
| Client: Boston Artery | Date: 1996 |
Design, install and interpret data from a full-scale vertical movement monitoring trial on Rail Tracks in Boston, USA.
|
| Client: Geotechnical Consulting Group (GCG). | Date: 1995 |
Design and install vertical and lateral movement monitoring system for London Underground Station, Ladbroke Grove. The system included some structural monitoring as well as electro-level inclinometers, rod extensometers, data logging, remote data retrieval and analysis software also provided by CMCS.
|
| Client: Imperial College. | Date: 1995 |
Design and install vertical movement monitoring system for London Underground ashfilled embankments, Canons Park..
|
| Client: Dean & Dyball Ltd. | Date: 1995 |
Manual and automatic monitoring of vertical and lateral movements of an embankment at Barnet.
|
| Client: University of Naples. | Date: 1994 |
Design and install landslip movement monitoring system in Potenza, Italy.
|
| Client: Morrish & Partners. | Date: 1994 |
Monitoring water levels, Speakers Green, Houses of Parliament, Westminster.
|
| Client: Property Services Agency | Date: 1994. |
Ground water level monitoring in Black Rod Gardens (Houses of Parliament), Westminster.
|
| Client: Burse Construction. | Date: 1989 - 90 |
Reinstate monitoring systems at Ladbroke Grove after new earth works were carried out.
|