Construction Monitoring Control Systems Ltd

Tel/Fax  01923 682300

 
 
  Bookmark this site.
 


  1. Index
  2. CMCS at BRE
  3. Development of AMS
  4. Non-destructive testing of Marine Jetties
  5. Fixed sensor monitoring of Diaphragm walls
  6. Monitoring Buildings during Redevelopment
  7. Tunnel Monitoring
  8. Embankment Systems
  9. Loggers
  10. Tunnel Distortion Monitoring
  11. In-place tilt monitoring system
  12. Tunnels Interaction System
  13. Re-Development of Small Properties
  14. Viaducts
  15. DLR at Mansion House
  16. Tunnel Monitoring System (Discrete beams)
  17. CTRL 240
  18. Dams
  19. Electro-levels
  20. Movement indicators
  21. Results of Charing Cross Load Cells
  22. Non-destructive testing of concrete structures
  23. Radio in Construction Monitoring
  24. Settlement Reducing Piles
  25. Land Surveying and Total Station Monitoring
  26. Vibration Monitoring
  27. Monitoring the complete strain history of concrete elements
  28. Past CMCS Projects

Client: Gear Construction Date: June 2002 -

Lambeth, London: Monitoring railway embankment close to top down construction of new Park Plaza hotel. Also automatic monitoring of diaphragm wall supporting the new excavation.

Client: SLR Date: 2001 - ongoing

Monitor ground movements under a new waste disposal cell at Bromborough to protect major oil pipeline.

Client: May Gurney Date: 2000 - ongoing

Design and install embankment monitoring system at Ilkley with alarm systems in both signal boxes and RailTrack control centres at York.

Client: Naples University

Design and install monitoring system for instrumented pile holding a landslide area in Italy.

Client: Christiani Nielsen.

Design and install an automatic movement system for an active 2-line railway embankment at Northfleet, Kent (Under Bridge 838) during the construction of a bridge under the embankment.

Client: Thorburn Colquhoun Date: 1999 - ongoing

Design and install an automatic movement monitoring system for an embankment in Paisley Scotland, Anchor House embankment.

Client: Edmund Nuttalls. Date: 1997 - 98.

Design and install a vertical and lateral movement monitoring system for a four-track section of rails at Dorney Bridge during condition grouting and push through of a new underbridge.

Client: Thorburn Colquhoun. Date: 1997

Design and install an embankment monitoring system at Cuffley.

Client: Thorburn Colquhoun. Date: 1997

Design and install an embankment monitoring system at Arkholme.

Client: Taylor Woodrow. Date: 1994 - 97

JLE 102 Main Monitoring Contract - as part of this project CMCS installed in place electro level inclinometer boreholes at locations including: Storeys Gate, Parliament St, New Palace Yard, Winchcote St and Mepham St. Several sets of instruments were also installed in the Westminster Diaphragm Wall. See also main entry under Buildings.

Client: Geocisa. Date: 1996

Design and install vertical movement monitoring system for main road stabilisation Madrid, Spain..

Client: Edmund Nuttalls. Date: 1996

Design and install an embankment monitoring system at Rayleigh Weir.

Client: Boston Artery Date: 1996

Design, install and interpret data from a full-scale vertical movement monitoring trial on Rail Tracks in Boston, USA.

Client: Geotechnical Consulting Group (GCG). Date: 1995

Design and install vertical and lateral movement monitoring system for London Underground Station, Ladbroke Grove. The system included some structural monitoring as well as electro-level inclinometers, rod extensometers, data logging, remote data retrieval and analysis software also provided by CMCS.

Client: Imperial College. Date: 1995

Design and install vertical movement monitoring system for London Underground ashfilled embankments, Canons Park..

Client: Dean & Dyball Ltd. Date: 1995

Manual and automatic monitoring of vertical and lateral movements of an embankment at Barnet.

Client: University of Naples. Date: 1994

Design and install landslip movement monitoring system in Potenza, Italy.

Client: Morrish & Partners. Date: 1994

Monitoring water levels, Speakers Green, Houses of Parliament, Westminster.

Client: Property Services Agency Date: 1994.

Ground water level monitoring in Black Rod Gardens (Houses of Parliament), Westminster.

Client: Burse Construction. Date: 1989 - 90

Reinstate monitoring systems at Ladbroke Grove after new earth works were carried out.

 
 
Home Page Tunnels Embankments Bridges Retaining Walls Pile Monitoring Buildings Environmental Surveying
Home Page Information Sheets Software - LogSafe Hardware - Data Acquistion Instrumentation
Home Page Taplow Pipe Jack Cheval Place St Andrews Hall Canonbury Tunnel Euston Covent Garden
Information