Construction Monitoring Control Systems Ltd

Tel/Fax  01923 682300

 
 
  Bookmark this site.
 


  1. Index
  2. CMCS at BRE
  3. Development of AMS
  4. Non-destructive testing of Marine Jetties
  5. Fixed sensor monitoring of Diaphragm walls
  6. Monitoring Buildings during Redevelopment
  7. Tunnel Monitoring
  8. Embankment Systems
  9. Loggers
  10. Tunnel Distortion Monitoring
  11. In-place tilt monitoring system
  12. Tunnels Interaction System
  13. Re-Development of Small Properties
  14. Viaducts
  15. DLR at Mansion House
  16. Tunnel Monitoring System (Discrete beams)
  17. CTRL 240
  18. Dams
  19. Electro-levels
  20. Movement indicators
  21. Results of Charing Cross Load Cells
  22. Non-destructive testing of concrete structures
  23. Radio in Construction Monitoring
  24. Settlement Reducing Piles
  25. Land Surveying and Total Station Monitoring
  26. Vibration Monitoring
  27. Monitoring the complete strain history of concrete elements
  28. Past CMCS Projects

Client: Davis and Samson Date: August 02

Borough Market, London: Monitoring stability of main line steel viaduct while excavation are carried out close to main support columns.

Client: Hyder Consulting Date: July 02 -

Harrow Road elevated section, London: Install permanent instrumentation to monitor long-term performance of two of the repaired bents. Instrumentation involves innovative shear detection tubes and radio signal conditioning for electro-levels and VW gauges.

Client: F M Conway Date: Jan - August 02

Harrow Road elevated section, London: Monitor prop loads supporting motorway deck off seven bents during concrete repairs to them:

Client: FM Conway Date: August - October 01

Harrow Road elevated section, London: Monitor performance of supporting bent before and after concrete repairs, involving monitoring strain in test pads of new replacement concrete.

Client: Kvaerner Date: 2000 - 2001

Install movement monitors of three bridges along the route of the CTRL at Newlands, Egerton and Pluckley.

Client: Taylor Woodrow Date: 1994 - 97

Jubilee Line Extension 104 (London Bridge Area) Main Monitoring Contract: As part of this Contract CMCS designed and installed viaduct and retaining wall movement monitoring systems for Station Approach abutment wall, Redcross way Viaduct North and South and Borough High St Viaduct. See also main entry under buildings.

Client: Taylor Woodrow Date: 1994 - 97

Jubilee Line Extension 102 Main Monitoring Contract. As part of this project CMCS undertook monitoring of Westminster Bridge. See also main entry under buildings.

Client: Roger Bullivant. Date: 1995 - 97

Yarm Viaduct. Monitoring the movement of piers of the 150-year-old British Rail Viaduct during strengthening of the foundation. The monitoring system involves electro-levels and water levels.

Client: Pontex. Date: 1997

Design and install a movement monitoring system employing electro levels and water levels for a 200m span bridge in the Czech Republic, during replacement of tensioning tendons..

Client: Laing Technology Group. Date: 1996

Design and install vertical and lateral movement monitoring systems for British Rail bridges at Acton and Stonebridge Park.

Client: Taylor Woodrow. Date: 1996

Install a tilt monitoring system for a viaduct in Kuala Lumpur.

Client: Keller Colcrete/Strathclyde Regional Council. *

The design and installation of a computer controlled automatic movement alarm system to control the stabilisation by compensation grouting of one of the abutments of the Kingston Bridge (M8 over the Clyde) in Glasgow.

 
 
Home Page Tunnels Embankments Bridges Retaining Walls Pile Monitoring Buildings Environmental Surveying
Home Page Information Sheets Software - LogSafe Hardware - Data Acquistion Instrumentation
Home Page Taplow Pipe Jack Cheval Place St Andrews Hall Canonbury Tunnel Euston Covent Garden
Information