| Client: Davis and Samson | Date: August 02 |
Borough Market, London: Monitoring stability of main line steel viaduct while excavation are carried out close to main support columns.
|
| Client: Hyder Consulting | Date: July 02 - |
Harrow Road elevated section, London: Install permanent instrumentation to monitor long-term performance of two of the repaired bents. Instrumentation involves innovative shear detection tubes and radio signal conditioning for electro-levels and VW gauges.
|
| Client: F M Conway | Date: Jan - August 02 |
Harrow Road elevated section, London: Monitor prop loads supporting motorway deck off seven bents during concrete repairs to them:
|
| Client: FM Conway | Date: August - October 01 |
Harrow Road elevated section, London: Monitor performance of supporting bent before and after concrete repairs, involving monitoring strain in test pads of new replacement concrete.
|
| Client: Kvaerner | Date: 2000 - 2001 |
Install movement monitors of three bridges along the route of the CTRL at Newlands, Egerton and Pluckley.
|
| Client: Taylor Woodrow | Date: 1994 - 97 |
Jubilee Line Extension 104 (London Bridge Area) Main Monitoring Contract: As part of this Contract CMCS designed and installed viaduct and retaining wall movement monitoring systems for Station Approach abutment wall, Redcross way Viaduct North and South and Borough High St Viaduct. See also main entry under buildings.
|
| Client: Taylor Woodrow | Date: 1994 - 97 |
Jubilee Line Extension 102 Main Monitoring Contract. As part of this project CMCS undertook monitoring of Westminster Bridge. See also main entry under buildings.
|
| Client: Roger Bullivant. | Date: 1995 - 97 |
Yarm Viaduct. Monitoring the movement of piers of the 150-year-old British Rail Viaduct during strengthening of the foundation. The monitoring system involves electro-levels and water levels.
|
| Client: Pontex. | Date: 1997 |
Design and install a movement monitoring system employing electro levels and water levels for a 200m span bridge in the Czech Republic, during replacement of tensioning tendons..
|
| Client: Laing Technology Group. | Date: 1996 |
Design and install vertical and lateral movement monitoring systems for British Rail bridges at Acton and Stonebridge Park.
|
| Client: Taylor Woodrow. | Date: 1996 |
Install a tilt monitoring system for a viaduct in Kuala Lumpur.
|
| Client: Keller Colcrete/Strathclyde Regional Council. * |
The design and installation of a computer controlled automatic movement alarm system to control the stabilisation by compensation grouting of one of the abutments of the Kingston Bridge (M8 over the Clyde) in Glasgow.
|